Procedures and tables for the construction and selection of chain sampling plans ChSP-4A(c1, c2,)r-Part 4

Raju, C. and Murthy, M.N.N. (1995) Procedures and tables for the construction and selection of chain sampling plans ChSP-4A(c1, c2,)r-Part 4. Journal of Applied Statistics, 22 (2). pp. 261-271.

Full text not available from this repository. (Request a copy)
Official URL: https://doi.org/10.1080/03069889400760251

Abstract

In this part of the series, the notion of average total inspection (ATI) is introduced to ChSP-4A (c(1) c(2))r chain sampling plans. Procedures have been developed for construction and selection of ChSP-4A (c(1) c(2))r plans, minimizing ATI at a given process average, while protection to the consumer is given in terms of average outgoing quality limit and limiting quality level. The procedure is similar to that of Dodge and Romig.

Item Type: Article
Subjects: E Mathematical Science > Mathematics
Divisions: Department of > Statistics
Depositing User: Users 23 not found.
Date Deposited: 19 May 2021 08:33
Last Modified: 19 May 2021 08:33
URI: http://eprints.uni-mysore.ac.in/id/eprint/16520

Actions (login required)

View Item View Item